Golden High School

October 28, 2017
Golden High School
Golden, Colorado
One of many schools we’ve had the privilege of building. Schedules we critical. On schedule and on budget.

Greenbox Self Storage

Greenbox Self Storage

As a design build for DCB Construction, this iconic self storage building adjacent to Coor’s Field was a mixture of structural stud framing and interior build-out. Built for Denver Commercial, our 25 year, long valued relationship has resulted in the construction of many storage facilities.
The “iconic towers” themselves have become well recognized.
  

Jeffco VA Building

Jeffco VA Building

Golden, Colorado
One of two design-build buildings we’ve done for Golden Builders in Golden, Colorado. Incorporating steel stud framing, stucco with elastic finish and complete interior build out specific to outpatient V.A. Hospital.
We’re proud of the craftsmanship employed for the betterment of our veterans.

King Soopers, Golden

King Soopers, Golden

Typical entry – Structural steel, sheathing, and EIFS in various colors. This store has over 2,000 linear feet of unique shapes on the exterior.
These stores, unique in design and style, offer their customers a shopping haven. Quality craftsmanship for a great Colorado company.
Together with new and remodeled stores, DDW has been part of an incredible King Soopers’ team,that has built more than 150 stores. 

Payson

Ruby Hill Park

Ruby Hill Park

Exterior heavy gauge roof built on multiple radii and designed as “floating fans.” This unique, geometrically complex park addition was built on time and on budget to exacting specifications. 
  

DU Law

DU Law

Denver University College of Law, a new building on campus, consists of 358500 square feet of framing, 238500 square feet of wall framing and 120000 square feet of ceiling and soffit framing.
Of the 238500 square feet of wall framing, 35000 was 10” 12ga studs used to achieve a plenum for all of the mechanical equipment located on the 5th floor. Additionally, the College of Law consists of 576000 square feet of drywall. Square footage is equal to 15000 sheets of drywall. Delta installed pre-constructed 16 ga panels to build up the floors in classrooms and also constructed a stadium style mock court room. The law building features 3 floors of library space and classrooms. One full floor is dedicated to office space.
Delta also constructed Nelson Hall and several other buildings on the DU Campus.
Delta is synonymous with quality. We’re proud to have contributed to the architectural legacy these “100 year buildings” bring to our home town.
  
 

Whole Foods, Frisco

Whole Foods, Frisco

One of the many Whole Food Stores built as “ground ups” adding to literally hundreds of retail buildings Delta has constructed for our clients.
On time scheduling is critical to commercial concerns. Time is money.
  

Conifer High School Auditorium

Conifer High School Auditorium

Conifer, CO
This is an example of a suspended auditorium ceiling in one of the many school buildings Delta has contributed to construction.
 

Evergreen Recreation Center

    

Evergreen Recreation Center

Challenging exterior radial framing for this ornate entry into the recreational center.
Constructed for Pinkard Construction, on time and on budget.